M. Tielrooij, C. Borst, M. M. Van-paassen, and M. Mulder, Predicting arrival time uncertainty from actual flight information, Proceedings of the 11th USA/Europe Air Traffic Management Research and Development Seminar, 2015.

R. G. Dear, The dynamic scheduling of aircraft in the near terminal area, 1976.

J. A. Bennell, M. Mesgarpour, and C. N. Potts, Airport runway scheduling, 4OR, vol.9, issue.2, pp.115-138, 2011.
DOI : 10.1007/s10288-011-0172-x

J. E. Beasley, M. Krishnamoorthy, Y. M. Sharaiha, A. , and D. , Scheduling aircraft landings: The static case, Transportation Science, vol.34, issue.2, pp.180-197, 2000.
DOI : 10.1287/trsc.34.2.180.12302

URL : http://bura.brunel.ac.uk/bitstream/2438/4769/1/Fulltext.pdf

A. Ghoniem, F. Farhadi, R. , and M. , An accelerated branch-and-price algorithm for multiple-runway aircraft sequencing problems, European Journal of Operational Research, vol.246, issue.1, pp.34-43, 2015.
DOI : 10.1016/j.ejor.2015.04.019

, Extended Aircraft Arrival Management under Uncertainty: A Computational Study

A. Lieder and R. Stolletz, Scheduling aircraft take-offs and landings on interdependent and heterogeneous runways, Transportation Research Part E, vol.88, pp.167-188, 2016.

H. Balakrishnan and B. G. Chandran, Algorithms for scheduling runway operations under constrained position shifting, Operations Research, vol.58, issue.6, pp.1650-1665, 2010.

J. A. Bennell, M. Mesgarpour, and C. N. Potts, Dynamic scheduling of aircraft landings, European Journal of Operational Research, vol.258, issue.1, pp.315-327, 2017.

L. A. Meyn and H. Erzberger, Airport arrival capacity benefits due to improved scheduling accuracy, Proceedings of the 5th Aviation, Technology Integration and Operations and the 16th Lighter-Than-Air Systems Technology and Balloon Systems Conferences, 2005.

H. Lee and H. Balakrishnan, A study of tradeoffs in scheduling terminal-area operations, Proceedings of the IEEE, vol.96, issue.12, pp.2081-2095, 2008.

G. Sölveling, S. Solak, J. Clarke, J. , and E. , Runway operations optimization in the presence of uncertainties, Journal of Guidance, Control, and Dynamics, vol.34, issue.5, pp.1373-1382, 2011.

G. Sölveling, C. , and J. , Scheduling of airport runway operations using stochastic branch and bound methods, Transportation Research Part C, vol.45, pp.119-137, 2014.

C. S. Bosson and D. Sun, Optimization of Airport Surface Operations Under Uncertainty, Journal of Air Transportation, vol.24, issue.3, pp.84-92, 2016.

A. Heidt, H. Helmke, M. Kapolke, F. Liers, M. et al., Robust runway scheduling under uncertain conditions, Journal of Air Transport Management Part A, vol.56, pp.28-37, 2016.

A. Heidt, Uncertainty Models for Optimal and Robust ATM Schedules, 2017.

M. Kapolke, N. Fürstenau, A. Heidt, F. Liers, M. Mittendorf et al., Pre-tactical optimization of runway utilization under uncertainty, Journal of Air Transport Management Part A, vol.56, pp.48-56, 2016.

A. Shapiro, H. Mello, and T. , On the rate of convergence of optimal solutions of Monte Carlo approximations of stochastic programs, SIAM Journal on Optimization, vol.11, issue.1, pp.70-86, 2000.

J. Bezanson, A. Edelman, S. Karpinski, and V. B. Shah, Julia: A Fresh Approach to Numerical Computing, SIAM Review, vol.59, issue.1, pp.65-98, 2017.

M. Xue and S. Zelinski, A stochastic scheduler for integrated arrival, departure, and surface operations in Los Angeles, Proceedings of the 15th Aviation Technology, Integration, and Operations Conference, 2015.

, Extended Aircraft Arrival Management under Uncertainty: A Computational Study