I. Anagnostakis, A multi-objective, decomposition-based algorithm design methodology and its application to runaway operations planning, 2004.

I. Anagnostakis and J. P. Clarke, Runway operations planning: a two-stage solution methodology, Proceedings of the 36th Annual Hawaii International Conference on System Sciences, 2003.

I. Anagnostakis, H. R. Idris, J. P. Clarke, E. Feron, R. J. Hansman et al., , 2000.

J. A. Atkin, E. K. Burke, J. S. Greenwood, and D. Reeson, Hybrid metaheuristics to aid runway scheduling at london heathrow airport, Transportation Science, vol.41, pp.90-106, 2007.

J. A. Atkin, E. K. Burke, J. S. Greenwood, and D. Reeson, A metaheuristic approach to aircraft departure scheduling at london heathrow airport, Computer-aided Systems in Public Transport, pp.235-252, 2008.

J. A. Atkin, E. K. Burke, J. S. Greenwood, and D. Reeson, On-line decision support for take-off runway scheduling with uncertain taxi times at london heathrow airport, Journal of Scheduling, vol.11, p.323, 2008.

J. A. Atkin, E. K. Burke, J. S. Greenwood, and D. Reeson, An examination of take-off scheduling constraints at london heathrow airport, 2009.

S. W. Bae, J. Park, and J. P. Clarke, Modified mixed integer linear program for airport departure scheduling, AIAA Guidance, Navigation, and Control (GNC) Conference, p.4885, 2013.

H. Balakrishnan and B. Chandran, Scheduling aircraft landings under constrained position shifting, AIAA guidance, navigation, and control conference and exhibit, p.6320, 2006.

H. Balakrishnan and B. Chandran, Efficient and equitable departure scheduling in real-time: new approaches to old problems. In 7th USA-Europe Air Traffic Management Research and Development Seminar, pp.2-05, 2007.

H. Balakrishnan and B. G. Chandran, Algorithms for scheduling runway operations under constrained position shifting, Operations Research, vol.58, pp.1650-1665, 2010.

J. A. Bennell, M. Mesgarpour, and C. N. Potts, Airport runway scheduling, vol.9, p.115, 2011.

D. Böhme, Tactical departure management with the eurocontrol/dlr dman, 6th USA/Europe Air Traffic Management Research and Development Seminar, 2005.

I. A. Chaudhry and A. A. Khan, A research survey: review of flexible job shop scheduling techniques, International Transactions in Operational Research, vol.23, pp.551-591, 2016.

M. A. Cruz-chávez, M. G. Martínez-rangel, and M. H. Cruz-rosales, Accelerated simulated annealing algorithm applied to the flexible job shop scheduling problem, International Transactions in Operational Research, vol.24, pp.1119-1137, 2017.

A. D'ariano, P. D'urgolo, D. Pacciarelli, and M. Pranzo, Optimal sequencing of aircrafts take-off and landing at a busy airport, Intelligent Transportation Systems (ITSC), pp.1569-1574, 2010.

R. Deau, J. B. Gotteland, and N. Durand, Airport surface management and runways scheduling, ATM 2009, 8th USA/Europe Air Traffic Management Research and Development Seminar, 2009.
URL : https://hal.archives-ouvertes.fr/hal-00940951

J. Du and J. Y. Leung, Minimizing total tardiness on one machine is np-hard, Mathematics of operations research, vol.15, pp.483-495, 1990.

F. Furini, M. P. Kidd, C. A. Persiani, and P. Toth, Improved rolling horizon approaches to the aircraft sequencing problem, Journal of Scheduling, vol.18, pp.435-447, 2015.
URL : https://hal.archives-ouvertes.fr/hal-01273501

G. Gupta, W. Malik, and Y. Jung, A mixed integer linear program for airport departure scheduling, 9th AIAA Aviation Technology, Integration, and Operations Conference (ATIO) and Aircraft Noise and Emissions Reduction Symposium (ANERS), p.6933, 2009.

G. Gupta, W. Malik, and Y. Jung, Incorporating active runway crossings in airport departure scheduling, AIAA Guidance, Navigation, and Control Conference, p.7695, 2010.

S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, Optimization by simulated annealing, vol.220, pp.671-680, 1983.

A. Lieder and R. Stolletz, Scheduling aircraft take-offs and landings on interdependent and heterogeneous runways, Transportation research part E: logistics and transportation review, vol.88, pp.167-188, 2016.

S. Lin and B. W. Kernighan, An effective heuristic algorithm for the traveling-salesman problem, Operations research, vol.21, pp.498-516, 1973.

W. Malik and Y. C. Jung, Exact and heuristic algorithms for runway scheduling, 16th AIAA Aviation Technology, Integration, and Operations Conference, p.4072, 2016.

J. Montoya, S. Rathinam, and Z. Wood, Multiobjective departure runway scheduling using dynamic programming, IEEE Transactions on Intelligent Transportation Systems, vol.15, pp.399-413, 2014.

R. Mori, Development of a pushback time assignment algorithm considering uncertainty, Journal of Air Transportation, pp.1-10, 2017.

G. Optimization, Gurobi optimizer reference manual, 2014.

P. Van-leeuwen, H. Hesselink, and J. Rohling, Scheduling aircraft using constraint satisfaction. Electronic notes in theoretical computer science 76, pp.252-268, 2002.