Predicting arrival time uncertainty from actual flight information, Proceedings of the 11th USA, pp.577-586, 2015. ,
The dynamic scheduling of aircraft in the near terminal area, 1976. ,
Airport runway scheduling, vol.4, pp.115-138, 2011. ,
Scheduling aircraft landings: The static case, Transportation Science, vol.34, issue.2, pp.180-197, 2000. ,
An accelerated branch-and-price algorithm for multiple-runway aircraft sequencing problems, European Journal of Operational Research, vol.246, issue.1, pp.34-43, 2015. ,
Scheduling aircraft take-offs and landings on interdependent and heterogeneous runways, Transportation Research Part E, vol.88, pp.167-188, 2016. ,
Algorithms for scheduling runway operations under constrained position shifting, Operations Research, vol.58, issue.6, pp.1650-1665, 2010. ,
Dynamic scheduling of aircraft landings, European Journal of Operational Research, vol.258, issue.1, pp.315-327, 2017. ,
Airport arrival capacity benefits due to improved scheduling accuracy, Proceedings of the 5th Aviation, Technology Integration and Operations and the 16th Lighter-Than-Air Systems Technology and Balloon Systems Conferences, 2005. ,
A study of tradeoffs in scheduling terminal-area operations, Proceedings of the IEEE, vol.96, issue.12, pp.2081-2095, 2008. ,
Runway operations optimization in the presence of uncertainties, Journal of Guidance, Control, and Dynamics, vol.34, issue.5, pp.1373-1382, 2011. ,
Scheduling of airport runway operations using stochastic branch and bound methods, Transportation Research Part C, vol.45, pp.119-137, 2014. ,
Optimization of Airport Surface Operations Under Uncertainty, Journal of Air Transportation, vol.24, issue.3, pp.84-92, 2016. ,
Robust runway scheduling under uncertain conditions, Journal of Air Transport Management Part A, vol.56, pp.28-37, 2016. ,
Uncertainty Models for Optimal and Robust ATM Schedules, 2017. ,
Pre-tactical optimization of runway utilization under uncertainty, Journal of Air Transport Management Part A, vol.56, pp.48-56, 2016. ,
Air traffic flow management at airports: a unified optimization approach, 2012. ,
Extended aircraft arrival management under uncertainty: A chance-constrained two-stage mixed-integer programming model, 2018. ,
On the rate of convergence of optimal solutions of Monte Carlo approximations of stochastic programs, SIAM Journal on Optimization, vol.11, issue.1, pp.70-86, 2000. ,
Julia: A Fresh Approach to Numerical Computing, SIAM Review, vol.59, issue.1, pp.65-98, 2017. ,
A stochastic scheduler for integrated arrival, departure, and surface operations in Los Angeles, Proceedings of the 15th Aviation Technology, Integration, and Operations Conference, 2015. ,
DOI : 10.2514/6.2015-2273